Road Construction





- Construction of 200km Road at Ighwenka, Ughelli South, Delta State
- Client: DESOPADEC
- Date: October 2014
- Services: Road Construction
HydroBlasting(Complete Hydroblasting and painting of module,1,4,6,19)






- Client: NNPC/NPDC/ENGRYPAC
- Date : August 2013
- Services: Hydroblasting
Akri Water Maintenance




- Client: Akri
Corrosion Control (Grit Blast & Paint The KOD/Flash Tank Of The Production Platform.




- Client: Agip Energy & Natural Resources (AENR)
- Date:December 2011
- Services: Corrosion Control
Construction of Abeogborodo Comprehensive Water Scheme




- Client: Delta State Government
- Date: April 2015
- Services: Borehole Maintenance
HVAC Maintenance & Repair




- Client: Century Energy
- Date:September 2013
- Services: HVAC Maintenance & Repair
The Installation And Commissioning Of Rotork Controls Ltd Pneumatic Actuator With Manual Over Ride GP-130C-485A/02D At Agbara Production Platform



- Client: Rotork
- Scope of Work 1: Supply of Rotork Controls Ltd Pneumatic Actuator GP- l30C-485A/02D.
- Scope of Work 2: Supply of Rotork Controls Ltd 8" manual gear box AB6800N/SP4
Design and Fabrication of Tank Stand in Kwale Gas Plant



- Scope of Work 1: Design of P&ID and Structural analysis
- Scope of Work 2:Excavation of foundation
- Scope of Work 3: Casting of foundation
- Scope of Work 4: Installation of Grating
- Scope of Work 5: Casting of 5” by 1” Beam
- Scope of Work 6: Installation of 10,000 Liters PVC Storage
- Scope of Work 7: Connection of distribution lines
Corrosion Control at NAOC Brass Terminal


- Client: NAOC
- Scope of Work 1: Containment of sensitive equipment
- Scope of Work 2:Power brushing of Corroded lines and components
- Scope of Work 3: Washing and Surface preparation
- Scope of Work 4:Priming of surface area and intermedia
- Scope of Work 5: Final Coating
Long Range Ultrasonic Testing (LRUT) On Trunk Line In Respect Of Oki-Oziengbe Unit Area




- Client: SAHARA GROUP
- Scope of Work 1: Conduct site visit for pipeline and terrain survey on the entire trunk line particularly TP7 to TP15. (Optional)
- Scope of Work 2: Submission of site visit report clearly stating methodology and results to be expected by LRUT.
- Scope of Work 3: Plan to inject a dye in order to identify the leak points along the trunk line.
- Scope of Work 4: Submission of detailed project schedule, resources and contractor's experience.
- Scope of Work 5: Conduct LRUT on pipeline from TP7 to TP15.
Corrosion Control at Ob Ob Gas Plant




- Scope of Work 1: Containment of sensitive equipment
- Scope of Work 2: Power brushing of Corroded lines and components
- Scope of Work 3: Washing and Surface preparation.
- Scope of Work 4: Priming of surface area and intermediate coat
- Scope of Work 5: Final Coating
Long Range Ultrasonic Testing (LRUTM) On OML 61 P/L FOR NAOC


- Client: NAOC
- Scope of Work 1: Site survey and reporting
- Scope of Work 2: Long range Ultrasonic testing (LRUT)
- Scope of Work 3: Data collection and Processing.
- Scope of Work 4: Fitness for service Analysis and Risk based Inspection.